Sidewalk Rehabilitation Project - 2019

Project Description: This project includes repair and replacement of cracked and deteriorated sidewalk segments identified and prioritized in the 2016 sidewalk survey. The project will remove and replace approximately 200 locations previously identified through the sidewalk survey and will coordinate with utility companies to repair locations affected by their underground utility vaults and boxes.

Project Status: Under Construction

Funding Source(s): General Fund

Latest Update: 02/28/2019 - Golden Bay will continue to finish layout limits of existing sidewalks that will be replaced. 

Contact: Evelyn Moran, Assistant Engineer, E-mail

More Information:

Sidewalk R&R