Project Description: This project includes a major retrofit and rehabilitation of the Main Street Bridge. This project will bring the bridge into conformance with current ADA and seismic requirements and extend the useful life.

Project Status: Design Phase 

Funding Source(s): Highway Bridge Program Grant (Federal Funding) and City General Fund

Latest Update: 11/9/2018 – Design contract awarded to Biggs Cardosa Associates, Inc. September 2018. Geotechnical drilling on both ends of the bridge scheduled for 11/14/2018 and 11/15/2018. Survey work for the bridge and surrounding area scheduled to start on 11/19/2018 for approximately two weeks. Traffic on Main Street will not be impacted by these activities.

Contact: Ray Razavi, P.E., Traffic Engineer, E-mail