Main Street Bridge Project

Project Description: This project includes a major retrofit and rehabilitation of the Main Street Bridge. This project will bring the bridge into conformance with current ADA and seismic requirements and extend the useful life.

Project Status: Design Phase 

Funding Source(s): Highway Bridge Program Grant (Federal Funding) and City General Fund

Latest Update: 4/16/2019 – Design contract was awarded to Biggs Cardosa Associates, Inc. Geotechnical drilling and Survey work for the bridge and surrounding area have been completed.  Design of various bridge elements is currently underway and to be followed by environmental document preparation.

Contact: Ray Razavi, P.E., Transportation Engineer, E-mail